It’s another Construction Update
Happy Monday friends!
We are less than a month away and time is ticking. Yes, we are very stressed, but it is a good stress- right Caleb? =)
A few things that are going right now:
-The fireplace is being built
-The Reception Hall has been textured and has the first coat of paint
-The front doors of The Reception Hall are installed and painted
-The kitchen is starting to look like a kitchen
-Bathroom walls are up
-The accent wall in the Groom’s Loft has been designed
-Round Tables for the Reception Hall have been delivered
-The Bridal Suite furniture will be delivered this week
The front door really completes the sleek look of The Reception Hall. And that pile in the front are the round tables to go inside when ready
View from the sliding kitchen doors. Painting everything white made a huge difference. We didn’t think it was possible, but it looks so much bigger now.
View to the Groom’s Loft. There will be sliding doors up top and railing will be installed soon. The batten strips are for the accent wall upstairs.
View from The Groom’s Loft.
Peep the industrial sink on the floor for the kitchen. That sucker is huge!
Speaking of kitchens, the first coat of paint on the kitchen cabinets
There is a ton of storage space and there will be an island in the middle for caterers to prep food
The men’s restroom. Maybe a boring picture, but hey it’s progress
The Groom’s Loft
The walls have been textured and painted. Once the bridal suite was finished, I have been so excited to get started on The Groom’s Loft and give him some personality.
It is hard to see and I didn’t want to give it all away, but this is the accent wall. It is going to look awesome.
The beginning of a fireplace. One of my favorite parts of the venue. He used some of the original brick to make me happy, but also newer brick to make it safe. The four corner oranger pieces are from the original and have a star in the middle. The final fireplace will be about 9 feet tall.